China 15kv 33kv 3 Phase Distribution Transformer Power Transformer - Power Transformer, Power Transformer

Transformer normal service conditionsThe height above the sea level is below 1000m;Highest air temperature +40ºC;Highest daily average air temperature+30ºC;Highest annual average air temperature +20ºC;Lowest outdoor air temperature -25ºC.(defines in detail when transformer in special service conditions )10/0.

Featured Products

Transformer normal service conditions

The height above the sea level is below 1000m;
Highest air temperature +40ºC;
Highest daily average air temperature+30ºC;
Highest annual average air temperature +20ºC;
Lowest outdoor air temperature -25ºC.
(defines in detail when transformer in special service conditions )

10/0.4kv 3 Phase Oil-Immersed 3D Core Distribution Transformer




10/0.4kV Oil-immersed transformer Technical parameters(Second level of energy efficiency)
 
Rated 
capacity 
(kVA)
 Voltage combinationConn-ected group labelNo-load
 loss   
 (W)
Load loss
(75°C)(W)
 No-load 
current(%)
Impedance 
voltage (%)
Exterior size
 (L x w x h) 
Total weight 
(kg)
High 
voltage(kV)
tap 
range
Low
 Voltage (kV)
306
6.3
6.6 
10 
10.5 
11
±2x2.5 
±5
0.4Dyn11 
YynO
 Yzn11
80630/6001.54800 x 500 x 850350
50100910/8701.3820 x 550 x 850400
631101090/10401.2835 x 580 x 850430
801301310/12501.2840 x 600 x 880450
1001501580/15001.1860 x 600 x 890490
1251701890/18001.11020x660x900610
1602002310/22001.01035x660x950670
2002402730/26001.01040x680x980730
2502903200/30500.91140x740x1010850
3153403830/36500.91160x760x1150970
4004104520/43000.81230x800x12101130
5004805410/51500.81320x900x12101345
630Dyn11 
YynO
57062000.64.51420x920x12301630
80070075000.61480x1000x12851950
1000830103000.61600x1100x13302215
1250970120000.51655x1135x13752565
16001170145000.51815x1260x14503100
20001550183000.451920x1305x15103785
25001830212000.42120x1430x15754570
Note: 1, To transformers whose rated capacity of 500kVA and below, load loss in the table above the diagonalis suitable for Dyn11 or Yzn11 connection group,
the load loss below the diagonal suitable for YynO connection group.
2,    according to user needs, can provide transformer with high voltage tap range
3,    according to user needs, can provide transformer with low-voltage of 0.69kV .
4,    if the user needs, can also choose other loss values.
5,    due to the continuous update of the product, weight &size in the table may changes.Most correct Dimension chart will be provied when making order.
China 15kv 33kv 3 Phase Power Distribution Transformer Electric Transformer - Power Transformer, Electric Transformer
China 15kv 33kv 3 Phase Power Distribution Transformer Electric Transformer - Power Transformer, Electric Transformer


ATTENTION:

1.The payment term: We accept TT,30% deposit and Pay 70% before shipment.
2.The delivery time: Usually it will take about 15-20 days.
3.The standard of package: Usually use strong wood case for protection.

OUR SERVICE:

1.quick response in before sales period help you got order.
2.excellent service in production time let you know each step we made.
3.reliable quality solve you after sale headache.
4.long period quality warranty ensure you can buy without hesitate.
2.1, For transformer whose rated capacity is 500 KVA and below, the load loss value above the slash in the table is suitable for Dyn11 or Yzn11 connection groups, and that below the slash for YynO connection groups.
2.2, Transformers whose HV tapping range is ±2×2.5 may be provided, if need be.
2.3, Transformers whose LV is 0.69KV may be provided, if need be.
2.4, Users may choose other loss values as they need.
2.5, Due to product upgrading and changes to the external dimensions and products in the table, please refer to the external dimensions provided at the time of ordering.

3.Our company:
China 15kv 33kv 3 Phase Power Distribution Transformer Electric Transformer - Power Transformer, Electric Transformer
China 15kv 33kv 3 Phase Power Distribution Transformer Electric Transformer - Power Transformer, Electric Transformer
China 15kv 33kv 3 Phase Power Distribution Transformer Electric Transformer - Power Transformer, Electric Transformer
China 15kv 33kv 3 Phase Power Distribution Transformer Electric Transformer - Power Transformer, Electric Transformer
China 15kv 33kv 3 Phase Power Distribution Transformer Electric Transformer - Power Transformer, Electric Transformer
China 15kv 33kv 3 Phase Power Distribution Transformer Electric Transformer - Power Transformer, Electric Transformer
China 15kv 33kv 3 Phase Power Distribution Transformer Electric Transformer - Power Transformer, Electric Transformer
China 15kv 33kv 3 Phase Power Distribution Transformer Electric Transformer - Power Transformer, Electric Transformer

4.Our extibition:
China 15kv 33kv 3 Phase Power Distribution Transformer Electric Transformer - Power Transformer, Electric Transformer
 
5.Yifa Main Product
YIFA 
main products: electric meter box, cable casing, high and low voltage electrical switchgear, transformer, box type substation, cable branch box, distribution box, ring network cabinet, JP cabinet, power distribution box, low voltage reactive power compensation control cabinet, electric energy metering box, high voltage metering device, porcelain insulator, composite insulator, transformer oil, electrical equipment, instrumentation, and insulated wire wire and cable, communication cable, cable accessories, monitoring equipment, electrical fittings and electrical equipment processing, Glass fiber reinforced plastics material with sheath (SMC), PC+ABS material metering box system Products, electric vehicle charging equipment, photovoltaic power generation equipment (excluding generators), wind power equipment production and sales.

6..RFQ
6.1.Q: Are you manufacturer?
    A: Yes, we are manufacturer. Our factory is in Binzhou City, Shandong  Province.
 6.2.Q: Can I get guarantee of products?
    A: Yes, every product is 1 year quality warrantee under customer correct using the products.
 6.3.Q: Do you have any Certificate?
    A: Yes. Each of our unit has CCC certificate. All the electric parts with CE certificate, If you need any other Certificate, we can help you to get it.
 6.4.Q: How to buy it? What about the delivery?
    A: Please contact me by email or online, let me know your situation, I will give you professional solution.We have shipping agent can choosing the cheapest and fastest delivery. FOB,CIF, C&F or EXW are no problem for us.
 6.5.Q: How can I pay you?
    A: T/T, L/C is very well used.
 6.6.Q: What about the production?
    A: Produce time is 4~6weeks.
 6.7.Q: Could you offer some spare parts?
    A: Yes, no problem.
 6.8.Q: What about the maintenance?
    A: All the goods past the test, maintenance is very easy.7

7.Contact
Should you have any problem,please contact with us,we will reply to you in 24 hour.
Manager: Joan
 



 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours